# Progress billing

**Progress billing is billing a job in stages as work is completed, usually by percent complete on each line of the schedule of values, instead of one invoice at the end.**

## Why it matters on a drywall job

- Billing as you go keeps cash coming in on long jobs.
- Overbilling or underbilling percent complete can cause friction with the GC either way.

## Related guides and tools

- [Drywall pay applications (blog)](https://tapeandfloat.com/blog/drywall-pay-application-texas.html)
- [Get paid faster on draws (GC guide)](https://gc.tapeandfloat.com/guides/get-paid-faster-draws.html)
- [All glossary terms](https://tapeandfloat.com/glossary/)

---

TapeAndFloat helps drywall and tape-and-float contractors keep up with the office side: bids, change orders, pay apps and follow-ups. Free 60-day pilot. If you stay on, we agree on the price with you up front.

**[Join the free pilot](https://tapeandfloat.com/office-assistant.html)**

_¿Prefiere español? [Facturación por avance](https://tapeandfloat.com/es/glosario/facturacion-por-avance.html)._