Free drywall crew schedule template (English + Spanish)

By James Grokman, CEO, TapeAndFloat · Updated 2026-10-28

A drywall crew schedule is a weekly list of which crew is on which job, doing what, on which day. This free bilingual template has column headers in English and Spanish so the office can plan the week, spot a crew booked on two jobs the same day, and send tomorrow's assignments to crews that work in Spanish.

The column headers are in both languages. The EJEMPLO row is sample data, not a real job.

Why a crew schedule matters for a drywall sub

The template

Download the bilingual CSV (opens in Excel or Google Sheets; one row per crew per day).

Column / Columna EJEMPLO (sample data)
Date / Fecha EJEMPLO / EXAMPLE: 10/30
Day / Día Thu / Jue
Crew lead / Encargado de cuadrilla Crew 2 (Luis) / Cuadrilla 2 (Luis)
Crew phone / Teléfono de la cuadrilla (555) 555-0102
Job ID / N.º de obra J-104
Job name and address / Obra y dirección Oak Hollow Lot 14, 123 Sample St / Lote 14, 123 Calle Ejemplo
GC or client / Contratista o cliente Example Builders (sample) / Example Builders (ejemplo)
Task (hang, tape, finish, texture, patch) / Tarea (colgar, encintar, acabado, textura, parchar) Tape / Encintar
Start time / Hora de entrada 7:00 AM
Est. days / Días estimados 2
Materials ready (Y/N) / Material listo (S/N) Y / S
Inspection or walkthrough / Inspección o recorrido Walkthrough with super 11/3 / Recorrido con el supervisor 11/3
Status / Estado Confirmed / Confirmado
Notes / Notas Gate code from super / Código de la reja con el supervisor

How to use it

  1. One row per crew per day. If Crew 2 works Monday through Wednesday at the same job, that's three rows. It looks like more typing, but it's what makes overlaps visible.
  2. Check for the same crew on two jobs the same day. Sort by Date, then by Crew. If the same crew shows up twice on one date at different jobs, move one of them before you send assignments.
  3. Confirm materials and access. Before a row goes to "Confirmed", check that material is on site and you have the address, gate code or contact the crew needs.
  4. Write down GC changes the same day. If the GC moves a start date or adds rooms, update the row and add a note. Extra work goes on a change order.
  5. Send tomorrow's assignments every afternoon. Text each crew lead with the format below and ask them to reply OK.
  6. Friday look-ahead. Every Friday, fill in next week's rows, check for double-bookings and missing materials, and confirm inspection dates with the GC.

Text format to send tomorrow's assignment to the crew

Mañana / Tomorrow: (día y fecha / day and date)
Obra / Job: (nombre y dirección / name and address)
Contratista / GC:
Tarea / Task: (colgar, encintar, acabado, textura, parchar)
Hora de entrada / Start time:
Material listo / Materials ready: Sí / No
Inspección o recorrido / Inspection or walkthrough:
Notas / Notes:
Contesta OK para confirmar / Reply OK to confirm

Phrases the office can text the crew

These use the informal "tú" most offices use when texting crews. Switch to "usted" if that's how you talk with your crew.

English Español
Crew schedule Horario de cuadrillas
Tomorrow you're at Oak Hollow, Lot 14. Mañana te toca Oak Hollow, Lote 14.
Start at 7:00 AM. Entras a las 7:00 AM.
Hang / tape / finish / texture / patch Colgar / encintar / acabado / textura / parchar
The material is already on site. El material ya está en la obra.
The material isn't there yet, wait for my text. El material todavía no llega, espera mi mensaje.
The GC moved the job to Thursday. El contratista movió la obra para el jueves.
The inspection is Monday, it has to be ready. La inspección es el lunes, tiene que estar listo.
Reply OK to confirm. Contesta OK para confirmar.
Send me a photo when you finish. Mándame una foto cuando termines.

Related

Frequently asked questions

What is a drywall crew schedule?

A list of which crew is at which job on each day, with the task (hang, tape, finish, texture or patch), the start time, whether materials are ready, and any inspection or walkthrough date.

Why one row per crew per day?

So you can see every day each crew is booked. If a crew covers three days at one job, that's three rows. When you sort by date and crew, a crew booked at two jobs on the same day stands out right away.

How do I spot a double-booked crew?

Sort the sheet by Date and then by Crew lead. If the same crew appears twice on one date with two different jobs, one of those jobs needs another crew or another day.

When should I plan next week?

A Friday look-ahead works well for many offices: fill in next week's rows, check for double-bookings and missing materials, and confirm inspection dates with the GC before the weekend.

Can I send assignments to the crew by text?

Yes. Use the bilingual text format on this page to send tomorrow's job, task, start time and materials status to each crew lead, and ask them to reply OK. The office updates the CSV.

Do I need TapeAndFloat to use this template?

No. The CSV is free and works in Excel or Google Sheets with no sign-up. TapeAndFloat is a separate AI office assistant that keeps jobs, crews and money straight in a Google Sheet and flags a crew booked at two jobs the same day so you can fix it.